Miner 3 - Goose Project - 3X3 (3 Weeks On, 3 Weeks Off) - FIFO
B2Gold, an international senior gold producer headquartered in Vancouver, is hiring for an Underground Construction Miner III position at the Goose Project in Nunavut. This fly-in/fly-out role operates on a 3x3 rotation and includes full camp accommodations and travel arrangements. Employees benefit from competitive wages and a full group benefits package.
Position
Field
Labour & SupportWork Rotation
Accommodations
Responsibilities
The Underground Construction Miner III is responsible for supporting critical underground construction tasks and operating heavy equipment safely.
- Read and follow underground construction prints
- Operate equipment such as boom trucks, scissor lifts, telehandlers, and more
- Construct bulkheads, escapeways, and walls
- Form, pour, and apply shotcrete
- Install and maintain mine infrastructure and services
- Conduct pre/post operational inspections of equipment
- Ensure safe practices and report conditions
- Maintain housekeeping standards
Requirements
Applicants should possess underground mining experience and certifications relevant to safety and skilled trades.
- Minimum 3 years of underground construction mining experience
- Trades certification (e.g., Welding, Carpentry) considered an asset
- Valid First Aid certificate required
- Strong safety and communication skills
Perks and Benefits
B2Gold provides competitive compensation and benefits for this rotational fly-in/fly-out position.
- Annual earnings up to $133,666 for 2184 hours
- Hourly rate: $48.50 regular, $72.75 overtime
- Comprehensive group benefits for employees and dependents
- Camp accommodations and travel provided
Worksite/Project
Goose Project
The Goose Gold Project is a high-grade gold mine development in Nunavut’s Back River District, currently under construction by B2Gold Corporation. Acquired in 2022 through B2Gold’s acquisition of Sabina Gold & Silver Corp., the Goose site is positioned to become one of Canada’s next significant gold producers. Situated approximately 520 km northeast of Yellowknife, the Goose Project is designed as a fly-in/fly-out operation with a seasonal winter road for bulk supplies and a permanent airstrip for personnel transport. The project includes a centralized processing facility, open-pit and underground mining infrastructure, and a fully equipped camp with rotational accommodations. The project is creating hundreds of jobs in construction, trades, camp services, logistics, environmental monitoring, and mine operations. As Nunavut’s mining sector continues to grow, the Goose Gold Project offers long-term employment, community development, and high-grade resource development in one of Canada’s most promising gold belts.
Goose ProjectEmployer Hiring
B2Gold
B2Gold Corporation is a Vancouver-based senior gold mining company with a strong presence in international markets and a growing footprint in Canada’s mining sector. Founded in 2007, B2Gold has built a reputation for responsible gold production through successful operations in Mali, Namibia, and the Philippines, while expanding into Canada through the development of the Goose Project in Nunavut. The Goose Project, part of the Back River Gold District, marks B2Gold’s first Canadian mining development. Located in Nunavut’s remote Kitikmeot Region, this high-grade open-pit and underground gold mine is set to begin production in 2025, bringing hundreds of skilled trades, technical, and fly-in/fly-out (FIFO) jobs to Northern Canada. The mine is expected to produce over 300,000 ounces of gold annually, making it a cornerstone of B2Gold’s long-term strategy. With a head office in Vancouver, BC, B2Gold supports Canada’s mining industry not only through resource development but also by championing ESG standards, Indigenous partnerships, and environmental responsibility. The company engages closely with Inuit communities through the Kitikmeot Inuit Association and integrates traditional knowledge into its operations.
B2Gold