Underground Construction Miner III - Goose Project - 3X3 (3 Weeks On, 3 Weeks Off) - FIFO
B2Gold, an international senior gold producer headquartered in Vancouver, is hiring for an Underground Construction Miner III position at the Goose Project in Nunavut. This fly-in/fly-out role operates on a 3x3 rotation and includes full camp accommodations and travel arrangements. Employees benefit from competitive wages and a full group benefits package.
Position
Field
Labour & SupportWork Rotation
Accommodations
Responsibilities
The Underground Construction Miner III is responsible for supporting critical underground construction tasks and operating heavy equipment safely.
- Read and follow underground construction prints
- Operate equipment such as boom trucks, scissor lifts, telehandlers, and more
- Construct bulkheads, escapeways, and walls
- Form, pour, and apply shotcrete
- Install and maintain mine infrastructure and services
- Conduct pre/post operational inspections of equipment
- Ensure safe practices and report conditions
- Maintain housekeeping standards
Requirements
Applicants should possess underground mining experience and certifications relevant to safety and skilled trades.
- Minimum 3 years of underground construction mining experience
- Trades certification (e.g., Welding, Carpentry) considered an asset
- Valid First Aid certificate required
- Strong safety and communication skills
Perks and Benefits
B2Gold provides competitive compensation and benefits for this rotational fly-in/fly-out position.
- Annual earnings up to $133,666 for 2184 hours
- Hourly rate: $48.50 regular, $72.75 overtime
- Comprehensive group benefits for employees and dependents
- Camp accommodations and travel provided
Worksite/Project
Goose Project
The Goose Gold Project is a high-grade gold mine development in Nunavut’s Back River District, currently under construction by B2Gold Corporation. Acquired in 2022 through B2Gold’s acquisition of Sabina Gold & Silver Corp., the Goose site is positioned to become one of Canada’s next significant gold producers. Situated approximately 520 km northeast of Yellowknife, the Goose Project is designed as a fly-in/fly-out operation with a seasonal winter road for bulk supplies and a permanent airstrip for personnel transport. The project includes a centralized processing facility, open-pit and underground mining infrastructure, and a fully equipped camp with rotational accommodations. The project is creating hundreds of jobs in construction, trades, camp services, logistics, environmental monitoring, and mine operations. As Nunavut’s mining sector continues to grow, the Goose Gold Project offers long-term employment, community development, and high-grade resource development in one of Canada’s most promising gold belts.
Goose ProjectEmployer Hiring
B2Gold
B2Gold Corp. is a Vancouver-based gold producer, publicly traded on the Toronto Stock Exchange, NYSE American, and Namibian Stock Exchange under the tickers BTO, BTG, and B2G. Founded in 2007 and headquartered in Vancouver, British Columbia, the company operates four gold mines: the Fekola mine in Mali, the Goose mine in Canada, the Masbate mine in the Philippines, and the Otjikoto mine in Namibia, and it also holds a portfolio of exploration and development projects across several countries. In Canada, B2Gold operates the Goose mine, a remote gold operation located in the Back River Gold District of Nunavut, which reached commercial production in October 2025 and is supplied by a seasonal winter ice road for fuel and materials. As a remote northern mine, Goose relies on fly-in fly-out operations and is one of the newest gold mines in the Canadian Arctic. B2Gold continues to advance growth and exploration projects around its operating mines, including the Fekola Regional expansion in Mali and further development within the Back River district in Nunavut.
B2Gold